USJR Flood
  • About
  • Calendar
  • Meetings
  • Documents
  • Agencies within Region
  • Resources
  • Contact
Home » Documents

SJRFCPA RFMP Scope Cheat Sheet

Posted by Administrator in Documents

SJRFCPA RFMP Scope Cheat SheetDownload

Read More

USJR Regional Flood Atlas 2015

Posted by Administrator in Documents

Read More
  • USJR Atlas March 2015
    File Size: 0 bytes

Final Upper San Joaquin River Regional Flood Management Plan

Posted by Administrator in Documents

Read More
  • USJR RFMP Final Document
    File Size: 0 bytes
  • USJR RFMP Final Appendices
    File Size: 0 bytes

Upper San Joaquin River Region Boundary Map

Posted by Administrator in Documents

...

Read More
  • Upper San Joaquin River Region Boundary Map
    File Size: 0 bytes

Calendar


« May 2022 »
Mo Tu We Th Fr Sa Su
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31          

Calendar by Kieran O'Shea

About Us

The San Joaquin River Flood Control Project Agency is a joint powers authority formed to lead the Regional Flood Management Plan (RFMP) and represent local interests. The Agency is composed of the Lower San Joaquin Levee District and the San Joaquin River Exchange Contractors Water Authority, with auditor/controller services provided by Merced County.

Latest Update

On February 25, 2022, DWR released public drafts of the State Plan of Flood Control Descriptive Document and Flood System Status Report. For links to the documents and instructions on how to submit comments, please visit Resources.

To view current state and federal funding updates and resources, please visit Resources.

If you’d like to be notified of future meetings and opportunities to review project documents, please Contact Us and provide your name and email address.

Click to see Calendar

Search


Administrator Login

© 2022 USJR Flood | Designed by Magma Creative